Exterior Building Maintenance Equipment had been provided on this building that was compliant. Lynn Safety was brought in to provide a custom guardrail for maintenance workers and building engineers that matched the existing guardrail on the building in order to keep the unique profile of the building.

Start My Custom Quote
Project Details
Year Built
2004
Building Height
203 Feet
Number of Stories
10
Service Utilized
Engineering & Consultation
Installation
Retrofitting
Testing & Certification
Inspections
Documentation
Equipment
Project Goals and Challenges
This project called for installing a new guardrail system that would match the existing guardrail system in shape and color. Lynn Safety was tasked with confirming all components matched the existing conditions on the building so as to not change the aesthetics. We then completed the project by providing annual inspections, load testing of the existing equipment, and an OPOS document.
Disney Building – Burbank, CA Slide
Disney Building – Burbank, CA Slide
Disney Building – Burbank, CA Slide
Disney Building – Burbank, CA Slide
Disney Building – Burbank, CA Slide
Disney Building – Burbank, CA Slide
Project Details
Year Built
2004
Building Height
203 Feet
Number of Stories
10
Service Utilized
Engineering & Consultation
Installation
Retrofitting
Testing & Certification
Inspections
Documentation
Equipment
Project Goals and Challenges
This project called for installing a new guardrail system that would match the existing guardrail system in shape and color. Lynn Safety was tasked with confirming all components matched the existing conditions on the building so as to not change the aesthetics. We then completed the project by providing annual inspections, load testing of the existing equipment, and an OPOS document.